Vår Energi Gets Nod to Use Marulk Field Subsea Infrastructure Until 2030 End

March 15, 2021

World Energy Reports LLC.
Marulk_bilde-2.jpg

Norwegian oil and gas company Vår Energi has received regulatory approval to use the subsea facilities on the Marulk field in the Norwegian Sea beyond their original operating life.

Vår Energi had consent for the operation of the Marulk field until December 31, 2021. 

The company has, in order to recover the remaining reserves from the field, applied for consent to extend the operating life of the subsea facilities on the field, and the consent has now been granted.

"We have now granted consent for the use of the subsea facilities on the Marulk field until 31 December 2030," the Petroleum Safety Authority Norway said Monday.

The Marulk field is located in the Norwegian Sea, 25 kilometers southwest of the Norne field. The water depth in the area is 370 meters. The Marulk was discovered in 1992, and the plan for development and operation (PDO) was approved in 2010. 

The field is developed with a subsea template tied-back to the production, storage, and offloading vessel (FPSO) Norne. Production started in 2012.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Annual five year outlook and forecast – At the start of each year we prepare a detailed assessment of future deepwater development and forecast the pace of orders for floating production systems over the next five years. Our 2021 annual report looks at market conditions likely to prevail through 2025 and provides our assessment of which of the 200+ floater projects in the planning queue will reach the final investment decision by end-2025
  • Monthly reports - Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 100 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In our May report we revisit the annual forecast and make revisions as needed.
  • Online database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.
  • Customer support - We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Demo