UTM Offshore Taps KBR for Support at Nigeria's First FLNG Project

May 20, 2021

World Energy Reports LLC.
image-pvince73adobestock-122746.jpg

Engineering and construction services giant  KBR has won a contract with Nigeria's UTM Offshore to support the development of Nigeria's first Floating Liquefied Natural Gas (FLNG) facility.

Acting as Owner's Engineers, KBR will be responsible for a multi-disciplined due diligence review of the Pre-Front End Engineering Design, being completed by Japanese engineering company JGC.

UTM Offshore is leading the development of the 1.2 million tonnes per year FLNG facility in collaboration with LNG Investment Management Services, a subsidiary of Nigeria National Petroleum Corporation.

"Through our highly experienced team, rich history in LNG, and clear focus on shaping sustainable solutions that support effective energy transition and carbon footprint reduction, we're excited by the opportunity to support UTM Offshore and the Nigerian National Petroleum Corporation to drive Nigeria's wider energy ambitions," said Jay Ibrahim, KBR President – Sustainable Technology Solutions.

"As a lower-carbon fuel and potential means to monetize flared gas, LNG is key in the progressive drive toward energy transition and a lower carbon future. This project will support the vision of UTM Offshore to contribute to decarbonization in Nigeria through gas monetization," KBR said. 

The company did not share the financial details of the contract.

As previously reported by Offshore Engineer, Japan's JGC earlier this month won Pre-FEED for the FLNG project.

This project calls for the Pre-FEED of an FLNG facility with a production capacity of 1,200,000 tons annually using gas from the Yoho gas field owned by ExxonMobil and the Nigerian National Petroleum Corporation.

After the completion of the Pre-FEED, FEED and EPC phases are planned. 

While the FLNG facility will be the first such unit in Nigeria, JGC is not a newcomer when it comes to FLNG. Namely, the company is currently working on the EPC of two FLNG facilities: for PETRONAS in Malaysia, and for Coral FLNG SA in Mozambique.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Annual five year outlook and forecast – At the start of each year we prepare a detailed assessment of future deepwater development and forecast the pace of orders for floating production systems over the next five years. Our 2021 annual report looks at market conditions likely to prevail through 2025 and provides our assessment of which of the 200+ floater projects in the planning queue will reach the final investment decision by end-2025
  • Monthly reports - Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 100 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In our May report we revisit the annual forecast and make revisions as needed.
  • Online database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.
  • Customer support - We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Demo