Suncor to Record Impairment Charge on White Rose Assets

January 7, 2021

World Energy Reports LLC.
West White Rose.jpg

Canadian energy company Suncor will record in the fourth quarter of 2020 a non-cash after-tax impairment charge of approximately $425 million on its share of the White Rose asset and West White Rose Project in the Jeanne d’Arc basin off Newfoundland and Labrador.

In October, the project's operator Husky Energy stuck a deal to merge with Cenovus, which according to Suncor, "cast significant doubt on the future of the West White Rose Project". The merger was finalized at the start of this year.

While the asset is currently producing, the West White Rose Project was intended to access 200 million barrels (gross) of crude oil and extend the life of the White Rose field by approximately 14 years. In September, Husky initiated a review of the project after construction at Argentia and Marystown was put on hold due to the COVID-19 pandemic and ensuing market challenges. At the time, the project as 60% complete.

Discussions are ongoing with the operator and various levels of government to determine the future of the project, Suncor said, noting that the Government of Newfoundland and Labrador has agreed to provide some support for the West White Rose Project in 2021.

The company's 2021 guidance remains unchanged as the White Rose field will remain on line producing as expected and Suncor’s guidance did not include any major capital spend on the West White Rose Project in 2021, it said.

The White Rose asset joint venture owners are Cenovus (operator, 72.5%,) and Suncor (27.5%). The West White Rose Project joint venture owners are Cenovus (operator, 69%), Suncor (26%) and Nalcor (5%).

Husky sanctioned the West White Rose development in May 2017. The field is being developed via a fixed wellhead platform consisting of topsides supported by a concrete gravity structure, tied to the Sea Rose floating production, storage and offloading unit (FPSO) in Canada's Atlantic Ocean. First oil had been planned for around the end of 2022, but current timelines are uncertain.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Annual five year outlook and forecast – At the start of each year we prepare a detailed assessment of future deepwater development and forecast the pace of orders for floating production systems over the next five years. Our 2021 annual report looks at market conditions likely to prevail through 2025 and provides our assessment of which of the 200+ floater projects in the planning queue will reach the final investment decision by end-2025
  • Monthly reports - Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 100 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In our May report we revisit the annual forecast and make revisions as needed.
  • Online database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.
  • Customer support - We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Trial