Ocean Installer Bags Triton Gig from Dana

January 23, 2020

World Energy Reports LLC.
Ocean Installer Bags .jpg

Aberdeen-based Oil and gas company Dana Petroleum has awarded Norway's Ocean Installer a contract for work at the Triton Area Development, located in the Central North Sea, around 190 km east of Aberdeen.

According to a press release, the award, which is Ocean Installer’s first with Dana, involves the installation and trenching of a 12” Flexible Production Flowline at the Guillemot field.

The project will be executed by Ocean Installer’s office in Aberdeen, with engineering work beginning immediately and offshore operations scheduled for Q2 2020. The construction support vessel Viking Neptun will be utilized for the offshore work.

“We are delighted to have been awarded this contract and to continue building upon our track record in the UK. This is our first award from Dana Petroleum, so we look forward to establishing a relationship with a key Operator through close cooperation on this project,” said Kevin Murphy, Interim CEO, Ocean Installer.

The Triton FPSO is located in Block 21/30, approximately 193 km/120 miles east of Aberdeen in the Central North Sea, in water depth of 95 meters and produces hydrocarbons from the Triton Development.

Joint venture partners in the Triton FPSO area are Dana, Tailwind and Endeavour. The development comprises the fields at Bittern, Gannet E, Guillemot West, Guillemot North-West, Clapham, Pict and Saxon.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Monthly reports -- Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 80 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In October of each year we provide a detailed five year forecast of production floater orders. In March of each year we fine tune the forecast and make revisions as needed.
  • Online database -- The online database is updated every day – with information direct from primary sources. In the database are details for 240 planned projects, 370 installations in service, 70+ floaters on order and 20+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Free Sample Report