McDermott Winds FEED for Scarborough FPU

February 5, 2019

World Energy Reports LLC.
Mia Yellagonga, Perth, Western Australia-web.jpg

McDermott International, Inc. on Tuesday announced it has signed a contract with Woodside Energy Ltd. to undertake a front-end engineering and design (FEED) activities for a floating production unit (FPU) for the Scarborough field natural gas development in Western Australia.

McDermott’s center of excellence in The Hague, Netherlands, will lead the study and early engineering. Upon completion, the contract includes the option to progress to an engineering, procurement, construction and installation (EPCI) contract should the project be approved for full development by Woodside and its Scarborough joint venture partners.

The FPU processes natural gas, which includes gas separation, dehydration and compression as well as Mono Ethylene Glycol (MEG) regeneration and water handling. The topside will be designed for a production capacity of 7-9 metric tons per annum and will be placed on a semi-submersible hull in 2,952 feet (900 meters) water depth. The FPU will be remotely operated and minimally manned.

The Scarborough gas field is located approximately 380 kilometers off the Burrup Peninsula in the Northwestern Shelf of Australia and contains 7.3 trillion cubic feet of natural gas reserves. The development covers 12 daisy-chained subsea wells to be tied back to a semisubmersible FPU located at the Scarborough field, with onshore processing on the Burrup Peninsula.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Monthly reports -- Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 80 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In October of each year we provide a detailed five year forecast of production floater orders. In March of each year we fine tune the forecast and make revisions as needed.
  • Online database -- The online database is updated every day – with information direct from primary sources. In the database are details for 240 planned projects, 370 installations in service, 70+ floaters on order and 20+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial