Kosmos Energy Update on Drilling Cedrela-1 Exploration Well

July 7, 2011

World Energy Reports LLC.
Kosmos Energy KOS 0.00% today provided an update on the company's drilling of the Cedrela-1 exploration well offshore the Republic of Ghana. The "Transocean Marianas" semi-submersible drilling rig, under contract to another operator in Ghana, was expected to arrive at the Cedrela-1 well location on the West Cape Three Points Block on or about July 10 to commence drilling Kosmos' Cedrela-1 well near the block's southern boundary. The rig was rendered temporarily inoperable following a reported anchor-handling incident on the Offshore Cape Three Points Block, which is east of the Kosmos-operated West Cape Three Points Block. The incident occurred while preparations were being made to move the rig from the other operator's block to the Cedrela-1 well location.
 
Kosmos has delivered a force majeure notice to the government of Ghana and the Ghana National Petroleum Corporation due to the delay in the rig's scheduled arrival at the Cedrela-1 well location. As a result, Kosmos has begun a search for a substitute drilling rig and intends to drill the Cedrela-1 well when either the "Transocean Marianas" or an alternative rig becomes available. The company has the necessary approvals to drill the Cedrela-1 well and anticipates that a rig will be available soon.
 
Kosmos is the operator of the West Cape Three Points Block in which the company holds a 30.875% interest. An affiliate of Anadarko Petroleum Corporation has a 30.875% interest; an affiliate of Tullow Oil plc has a 22.896% interest; E.O. Group Limited has a 3.5% interest; Sabre Oil & Gas Holdings Limited has a 1.854% interest; and the Ghana National Petroleum Corporation has a 10% carried interest.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Monthly reports -- Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 80 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In October of each year we provide a detailed five year forecast of production floater orders. In March of each year we fine tune the forecast and make revisions as needed.
  • Online database -- The online database is updated every day – with information direct from primary sources. In the database are details for 240 planned projects, 370 installations in service, 70+ floaters on order and 20+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Free Sample Report
Related company: » Tullow oil plc