Helang FPSO Process System Delivered

August 12, 2019

World Energy Reports LLC.
{d6c16c79-30b1-415a-81de-4f185aaac0b5}_Helang600x338.jpg

Oilfield equipment and services company NOV said it has completed the first full topside process systems delivery for Helang FPSO redeployment.

NOV's Process and Flow Technologies business unit was contracted by Yinson to design and deliver the full topside process system for FPSO Helang. The delivery consisted of nine new process skids and modules: HP flare KO drum, export gas metering, gas turbine generator, inlet production separator, gas dehydration, TEG regen/flash gas compressor, export gas compressor, condensate heat skid and pipe rack.

The nine process modules were completed within 15 months, NOV said.

The FPSO Helang redeployment has been NOV's first full topside process systems delivery (separation, gas, and water treatment) and the first project with an integrated execution model, with engineering, procurement, and construction all done in-house. This not only minimized interfaces but helped deliver a fast-track project in a tight time schedule.

The project encompasses redeployment of the existing FPSO Four Rainbow—now named FPSO Helang—that will operate in Block SK10 offshore Sarawak, East Malaysia. NOV delivered topside modules for this FPSO in 2003 and further upgraded it with an additional module in 2009. The basis of design for the new fields (Helang and Layang) required significant modifications in the process systems.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Monthly reports -- Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 80 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In October of each year we provide a detailed five year forecast of production floater orders. In March of each year we fine tune the forecast and make revisions as needed.
  • Online database -- The online database is updated every day – with information direct from primary sources. In the database are details for 240 planned projects, 370 installations in service, 70+ floaters on order and 20+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Free Sample Report