FPSO Mooring Inspection Contract for Welaptega

January 17, 2013

World Energy Reports LLC.

Welaptega Marine awarded contract for a mooring inspection & fitness for purpose evaluation on 'Dhirubhai-1' floating production storage & offloading (FPSO) vessel.

The Dhirubhai-1 floating production storage and offloading (FPSO) facility is located in the Bay of Bengal, off the eastern coast of India, and the contract client is Aker Floating Production.

A team of specialist engineers will deploy Welaptega’s suite of visualization and inspection technologies including the High-Definition 3D Video (HD3DV), 3D Modeling (3DM), Opticial Chain Measurement System (CMS), Subsea Chain Measurement Caliper and the Rope Measurement System (RMS).
 
Welaptega will work with offshore engineering firm BPP-TECHin the UK to establish the Fitness for Purpose Evaluation using data on operational history, met-ocean conditions, design, installation and maintenance of the mooring spread.
 
The inspection of the FPSO’s mooring system is a rolling annual program in which three mooring lines will be inspected on the facility in each year.
 
FPSO Dhirubhai-1 is a converted oil tanker operating at 1200m water depth with a production capacity of 60,000 bpd. It is on contract to Reliance Industries Ltd. until 2018.

Welaptega Marine is a DNV, Lloyds Register and ABS approved service provider with a 15-year history of providing high quality, repeatable in-service inspection services on permanently installed mooring systems for clients in the UK, Norway, US, West Africa and Australia.

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Monthly reports -- Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 80 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In October of each year we provide a detailed five year forecast of production floater orders. In March of each year we fine tune the forecast and make revisions as needed.
  • Online database -- The online database is updated every day – with information direct from primary sources. In the database are details for 240 planned projects, 370 installations in service, 70+ floaters on order and 20+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Free Sample Report
Related company: » Aker Floating Production