Equinor Sanctions $8B Bacalhau Field Development in Brazil

June 1, 2021

World Energy Reports LLC.
Bacalhau Equinor Brazil.jpg

Norwegian oil and gas company Equnior has made a final investment decision for the development of the Bacalhau field offshore Brazil.

The development of the field located in the Santos Basin will cost around $8 billion.

 Arne Sigve Nylund, Equinor’s executive vice president for Projects, Drilling, and Procurement said: "This is an exciting day. Bacalhau is the first greenfield development by an international operator in the pre-salt area and will create great value for Brazil, Equinor, and partners. Good cooperation with partners, Brazilian authorities, and suppliers has resulted in an investment decision for the Bacalhau field."

“Bacalhau is a globally competitive project with a break-even below USD 35 in a key energy region. Estimated recoverable reserves for the first phase are more than one billion barrels of oil,” says Nylund. 

The development plan was approved by the Brazilian National Agency of Petroleum, Natural Gas and Biofuels (ANP) in March 2021. 

It includes 19 subsea wells that will be tied back to an FPSO to be supplied by MODEC. First oil production is planned for 2024.

The field is located 185 km from the coast of the municipality of Ilhabela/SP, in the state of São Paulo, in water depths of 2050 meters.  

“Bacalhau is an important step towards the realization of our strategic ambition to deepen our presence in Brazil.  It is also an important project for the country, as it represents significant investments, ripple effects in the supply chain, and local job creation,” says Veronica Coelho, Equinor’s country manager in Brazil.

The Bacalhau field spreads across two licenses, BM-S-8 and Norte de Carcará. The FPSO at the field will be one of the largest FPSOs in Brazil with a production capacity of 220,000 barrels per day and two million barrels in storage capacity. The stabilized oil will be offloaded to shuttle tankers and the gas from Phase 1 will be re-injected in the reservoir.

The FPSO contractor MODEC will operate the FPSO for the first year. After that, Equinor plans to operate the facilities until the end of the license period.

Partners in Bacalhau are Equinor 40% (operator), ExxonMobil 40%, Petrogal Brasil 20% and Pré-sal Petróleo SA (Government Company, PSA Manager).


Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Annual five year outlook and forecast – At the start of each year we prepare a detailed assessment of future deepwater development and forecast the pace of orders for floating production systems over the next five years. Our 2021 annual report looks at market conditions likely to prevail through 2025 and provides our assessment of which of the 200+ floater projects in the planning queue will reach the final investment decision by end-2025
  • Monthly reports - Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 100 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In our May report we revisit the annual forecast and make revisions as needed.
  • Online database - The online database is updated every day – with information direct from primary sources. In the database are details for 200+planned projects, 390+ installations in service, 40+ floaters on order and 40+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database. Data are easily exported to excel spreadsheet.
  • Customer support - We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request a Demo