Eni Makes Discovery Offshore Ghana

May 10, 2019

World Energy Reports LLC.
maersk-voyager-3.jpg

Italian supermajor Eni said it has found gas and condensate in the first exploration well drilled in CTP-Block 4, approximately 50 kilometers off the Ghana coast.

The well was drilled on the Akoma exploration prospect and proved an estimated volume between 550 and 650 bcf of gas and 18-20 mmbbl of condensate, with potential for additional upside that will require further drilling to be confirmed, Eni said.

Akoma - 1X was drilled by the Maersk Voyager drillship in a water depth of 350 meters and reached a total depth of 3,790 meters. The well proved a single gas and condensate column in a 20-meter-thick sandstone reservoir interval of cenomanian age with good petrophysical properties and with hydrocarbon down to, Eni said.

The discovery, which is about 12 kilometers northwest from Sankofa hub, where the John Agyekum Kufuor floating production, storage and offloading unit (FPSO) is located, could produce through a subsea tieback to the FPSO.

The FPSO has production capacity for 58,000 b/d oil and 210 mmcf/d gas, according to World Energy Reports. It began producing oil in May 2017 and gas in July 2018.

Partners in the CTP-Block 4 include Eni Ghana (operator, 42.469%), Vitol Upstream Tano (33.975%), GNPC (10%), Woodfields Upstream (9.556%), Explorco (4%).

Floating Production Week delivers unrivaled overview, insight and analysis to the Offshore Floating Production Systems and Technology market

Floating Production Systems Report And Online Database

  • Monthly reports -- Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 80 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In October of each year we provide a detailed five year forecast of production floater orders. In March of each year we fine tune the forecast and make revisions as needed.
  • Online database -- The online database is updated every day – with information direct from primary sources. In the database are details for 240 planned projects, 370 installations in service, 70+ floaters on order and 20+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial