Stories

HHI.jpg

HHI to Build FPS for LLOG Exploration

October 11, 2018

South Korean shipbuilder Hyundai Heavy Industries (HHI) has been awarded a contract to build a floating production system (FPS) for LLOG Exploration of the U.S. HHI, the world's biggest shipbuilder by orders, said in a stock exchange announcement…

Subsea 7.jpg

Tullow Hires Subsea 7 for Offshore Ghana

October 11, 2018

Subsea 7 S.A. announced the award of a contract by Tullow Ghana Limited on the Jubilee field, offshore Ghana, in water depths of up to 1000 meters. According to a press release from the London-headquartered subsea engineering company, the engineering…

6280287836_e459007b44_o.jpg

Shell Sees Nigeria Corruption Trial Lasting Many Months

October 11, 2018

Royal Dutch Shell expects a landmark corruption trial over a Nigerian oil deal to last many months, warning staff of continued critical media coverage in the $1.3 billion case, according to an internal memo seen by Reuters. Shell's Legal Director…

Floating Production Systems Report And Online Database

  • Monthly reports -- Our monthly reports provide a detailed snapshot of the business sector as of the middle of each month. More than 80 pages of data and industry analysis each month. Excel spreadsheets with each report enable subscribers to tailor the data presentation to their needs. In October of each year we provide a detailed five year forecast of production floater orders. In March of each year we fine tune the forecast and make revisions as needed.
  • Online database -- The online database is updated every day – with information direct from primary sources. In the database are details for 240 planned projects, 370 installations in service, 70+ floaters on order and 20+ floaters available. The database is fully searchable. Customized charts and spreadsheets can be directly produced from the database.
  • Customer support -- We are available to assist with technical questions about information in the database and reports -- and assist with any questions about using the database search tools.

Here's what you get!

Request Free Trial
AdobeStock_8691825.jpeg

AGL LNG Import Project Slowed by Environment Review

October 10, 2018

Plans by Australia's AGL Energy to start importing liquefied natural gas from 2021 will be delayed after the state of Victoria called for the company and its pipeline partner to submit a full environmental assessment of their project. The review process typically takes nine to 12 months…

Yinson .jpg

Yinson's Knock Allan FPSO Contract Terminated

October 10, 2018

Malaysia’s Yinson Holdings Bhd has received the termination of an FPSO contract for its Knock Allan FPSO located on the Olowi field offshore Gabon. The oil and gas services company said in a press release that the contract with Canadian Natural Resources (CNR) International (Olowi) Ltd…

Natural Gas is Here to Stay, Big Oil Says

October 9, 2018

Energy companies are betting demand for natural gas will rise at break-neck pace for decades, undermining warnings that tackling climate change would require a rapid switch to renewable energy. Top oil companies including Royal Dutch Shell,…

FPSO Book Front Cover WEB.jpg

New Book Release: Why Only Two FPSOs in the U.S. Gulf of Mexico?

October 9, 2018

The Late Start and Twenty Year Saga. More than 40 years have passed since the trailblazing Shell Castellon started operation as the first floating production storage and offloading (FPSO) unit in 1977. Ever since, hundreds of these vessels have operated worldwide…

AdobeStock_184685451.jpeg

British North Sea Oil Costs, Spending on the Rise

October 9, 2018

The costs and operating expenditure needed to produce oil and gas in the British North Sea are set to rise both in overall and in per-barrel terms this year compared with 2017, the country's regulator for the sector said on Tuesday. Overall…

Skandi Hav.jpg

DOF Bags Contract Extension in Brazil

October 8, 2018

Norwegian supply shipping company DOF ASA said its vessel Skandi Hav has been granted a 226-day extension by Petrobras in support of work offshore Brazil. The 1983-built Skandi Hav is now secured firm until June 8, 2019. The vessel is currently…

Alfa Laval.jpg

Alfa Laval to Suppy Pumping Systems for China-built FPSO

October 5, 2018

Alfa Laval won an order to supply Framo pumping systems to an FPSO (Floating Production, Storage and Offloading) vessel to be built in China. The provider of specialized products and engineering solutions based on its key technologies of heat transfer…

Petrobras Repays 2 Bln Real Loan, Opens Fresh Credit Line

October 5, 2018

Brazil's state-controlled oil company Petroleo Brasileiro said on Friday it prepaid a 2 billion real ($516.13 million) loan due in 2020 from Banco do Brasil, and opened a new credit line for the same amount with the same bank due in 2025. The…

libra_release_3_1920x1080.jpg

Aker Solutions to Supply Subsea Production System for Mero 1

October 5, 2018

Aker Solutions said it has secured an order from Petrobras to provide a subsea production system and related services for the Mero 1 project, the first full production project within the major Mero field development, one of the largest oil discoveries in Brazil's pre-salt area.

aker 10-4.png

Aker Solutions to Provide Brownfield Services for BP in Angola

October 4, 2018

Aker Solutions has been awarded a five-year agreement to supply brownfield modifications, maintenance and operations support for BP's Greater Plutonio and PSVM fields offshore Angola. The work scope covers the supply of engineering, procurement…

1a2-Goliat-StrilBarents-DJI_0559.jpg

Norway's Goliat Oilfield to Restart by Friday

October 4, 2018

Oil production at Eni's Arctic Goliat field off the coast of Norway will restart by Friday following maintenance, the company told Reuters on Thursday. The restart had originally been planned for Oct. 1, but Eni extended the outage to carry…

IEAF_Birol5461_HD.jpg

IEA boss urges oil producers to ease supply concerns

October 4, 2018

Major oil producers must take "the right steps" to ease supply concerns that have lifted crude prices to a four year-high, the head of the International Energy Agency told Reuters on Thursday. "It is now high time for all the players, especially those key producers and oil exporters…

AdobeStock_212305222.jpeg

IMA Completes 12-month Study of the Floating Liquefaction and Regasification Market

October 4, 2018

International Maritime Associates has just completed a 12-month study of the global market for floating gas liquefaction plants and floating LNG regasification terminals. The 150+ page study, published by World Energy Reports , is the most detailed analysis yet made of this growing business sector.

Bahrain .jpg

FSU Delivered to Bahrain LNG

October 3, 2018

Teekay LNG’s first Floating Storage Unit (FSU) has been successfully delivered to charterer Bahrain LNG. The vessel delivered from the yard at the end of August, before going on hire on 19 September, 2018. The vessel will be used to support…

Libra-FPSo-May-2017-750x563.jpg

Petrobras Test Well at Mero Field Reached 58,000 BPD

October 3, 2018

Oil company Petróleo Brasileiro SA, or Petrobras, said on Wednesday it finished a long-term test at the Mero field in the Libra pre-salt area with positive results. The Brazilian company said in a statement that the well used for the test in Mero reached an average production of 58…

offshore-operations-750w.jpg

Chevron Extends North Sea Contract with Petrofac

October 3, 2018

Petrofac’s Engineering and Production Services (EPS) division has secured a 12-month engineering services contract extension from Chevron North Sea Limited. The agreement, which has been held by Petrofac since 2014, commenced on September 30.

Baker Hughes to Bid for Petrobras Production-sharing Contract

October 3, 2018

General Electric Co's unit Baker Hughes is preparing an offer for a production-sharing deal with Brazil's Petrobras, a Baker Hughes executive said on Tuesday, as the state-run oil company seeks creative ways to boost output from mature fields.

Total:1477 Returned:20